Friday, 13 October 2017

Call sheet

Call  Sheet No:     1     

Production:A2 Media Music Video

Production company: Leyton
Co-Producer: Jordanah,Shikeera , Tawania and Timeira


Director:
Jordanah,Shikeera , Tawania and Timeira
1st AD:


Crew  Call: Jordanah, timeira, Tawania, shikeera
Estimated wrap:
 Shooting  Date:
 13thOctober 2017

*** See movement order 1 and attached map ***

Location: Leyton sixth form college tv studio

Location contact: 020 8928 9000 


*** NO SMOKING ON ANY SET ***


SET

*SCENES

PAGES

CAST  Nos

LOCATION

TV studio
7
3
3
TV studio

 












































NO.
ARTISTE
CALL TIME
MAKE-UP
REMARKS

1
Jasmine
11.30-1.30
Tawania
 

2
Jordanah
11.30-1.30
Tawania
 

3
kailin
11.30-1.30
Tawania
 





 





















CAMERA / LIGHTING
PROPS / DESIGN

Artificial lighting – photography lights



COSTUME / MAKE UP
CATERING

Costume provided by jordanah and make-up done by Tawania




NOTES:













Monday, 9 October 2017

risk assesment

Risk Assessment
Production Title: A2 Music Video – SWV – I’m so into you
Crew: Tawania, Jordanah, Shakieera and Timeira
Cinematographer: Tawania, Jordanah, Shakieera and Timeira
Date: 25/10/17
The following potential risks / hazards might be present:
·         Floor space     
·         Tripping hazards        
·         Low lighting   
·         Adverse weather / temperatures      
·         Electrical cords and sockets  
·         Flammable materials Crowds                       
·         Fatigue                       
·         Traffic
·         Water
·         Pedestrian interaction/noise

Where present, please list them below:
Risk / Hazard identified
Locations
People affected
Existing controls
Action to be taken to reduce risk or hazard
Floor space          
·         Studio
·         TV studio
·          


Cast and crew
N/A
Carefully place camera equipment and props on a stable floor to ensure it doesn’t fall over.
Tripping hazards
·         Studio
·         TV studio
·         God’s own junkyard
·          


Cast and crew
N/A
Tie all cables up from the camera, shoot in flat land to minimise the chance of falling.
Low lighting
·         God’s own junkyard
·          


Cast and crew
N/A
Shoot in well-lit areas with street lighting
Adverse weather / temperatures

·         Brick Lane
·         God’s own junkyard

Cast and crew
N/A
Make sure we are prepared from the day before so our crew is not left in cold weather all day.
Electrical cords and sockets
·         Studio


Cast and crew
Cables are taped down.

Fatigue  



Cast and crew
Regular breaks
As we are ‘hiring’ them we will provide them with food and drinks for energy. However crew will possibly be tired as were filming all day.
Traffic
·         Brick Lane
·         God’s own junkyard
Cast and crew
N/A
We will take train and bus to our locations. The day before we will check the train’s service to make sure there is a good service as for buses we can check bus times.
Crowds
·         Brick Lane
·         Studio
Cast and crew
N/A
Go at off-peak hours therefore there will be less people.
We will book the studio in advance and only have the crew and cast in the room.

question 4