|
Call Sheet No: 1
|
||||||||||||||||
Production:A2 Media Music Video
Production company: Leyton
|
Co-Producer: Jordanah,Shikeera ,
Tawania and Timeira
|
|||||||||||||||
|
Director:
Jordanah,Shikeera , Tawania and
Timeira
|
1st AD:
|
|||||||||||||||
|
Crew
Call: Jordanah, timeira, Tawania, shikeera
Estimated wrap:
|
Shooting Date:
13thOctober 2017
|
|||||||||||||||
*** See movement order 1 and attached map ***Location: Leyton sixth form college tv studio
Location contact: 020 8928 9000
|
||||||||||||||||
|
*** NO SMOKING ON ANY SET ***
|
||||||||||||||||
|
SET
|
*SCENES
|
PAGES
|
CAST Nos
|
LOCATION
|
||||||||||||
|
TV
studio
|
7
|
3
|
3
|
TV
studio
|
||||||||||||
|
|
|
|
|
|
||||||||||||
|
|
|
|
|
|
||||||||||||
|
|
|
|
|
|
||||||||||||
|
|
|
|
|
|
||||||||||||
|
|
|
|
|
|
||||||||||||
|
|
|
|
|
|
||||||||||||
|
|
|
|
|
|
||||||||||||
|
|
||||||||||||||||
|
NO.
|
ARTISTE
|
CALL TIME
|
MAKE-UP
|
REMARKS
|
||||||||||||
|
1
|
Jasmine
|
11.30-1.30
|
Tawania
|
|
||||||||||||
|
2
|
Jordanah
|
11.30-1.30
|
Tawania
|
|
||||||||||||
|
3
|
kailin
|
11.30-1.30
|
Tawania
|
|
||||||||||||
|
|
|
|
|
|
||||||||||||
|
|
|
|
|
|
||||||||||||
|
|
|
|
|
|
||||||||||||
|
|
|
|
|
|
||||||||||||
|
|
||||||||||||||||
|
CAMERA / LIGHTING
|
PROPS / DESIGN
|
|||||||||||||||
Artificial lighting – photography lights
|
|
|||||||||||||||
|
COSTUME / MAKE UP
|
CATERING
|
|||||||||||||||
|
Costume
provided by jordanah and make-up done by Tawania
|
|
|||||||||||||||
|
|
||||||||||||||||
|
NOTES:
|
||||||||||||||||
|
|
||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|||||||
Friday, 13 October 2017
Call sheet
Tuesday, 10 October 2017
Monday, 9 October 2017
risk assesment
Risk Assessment
Production Title: A2 Music Video – SWV – I’m so into
you
Crew: Tawania, Jordanah, Shakieera and
Timeira
Cinematographer: Tawania, Jordanah, Shakieera and
Timeira
Date: 25/10/17
The
following potential risks / hazards might be present:
·
Floor
space
·
Tripping
hazards
·
Low
lighting
·
Adverse
weather / temperatures
·
Electrical
cords and sockets
·
Flammable
materials Crowds
·
Fatigue
·
Traffic
·
Water
·
Pedestrian
interaction/noise
Where present, please list them
below:
|
Risk
/ Hazard identified
|
Locations
|
People
affected
|
Existing
controls
|
Action
to be taken to reduce risk or hazard
|
|
Floor space
|
·
Studio
·
TV studio
·
|
Cast and crew
|
N/A
|
Carefully place camera equipment and
props on a stable floor to ensure it doesn’t fall over.
|
|
Tripping hazards
|
·
Studio
·
TV studio
·
God’s own
junkyard
·
|
Cast and crew
|
N/A
|
Tie all cables up from the camera,
shoot in flat land to minimise the chance of falling.
|
|
Low lighting
|
·
God’s own
junkyard
·
|
Cast and crew
|
N/A
|
Shoot in well-lit areas with street
lighting
|
|
Adverse weather / temperatures
|
·
Brick Lane
·
God’s own
junkyard
|
Cast and crew
|
N/A
|
Make sure we are prepared from the day
before so our crew is not left in cold weather all day.
|
|
Electrical cords and sockets
|
·
Studio
|
Cast and crew
|
Cables are taped down.
|
|
|
Fatigue
|
|
Cast and crew
|
Regular breaks
|
As we are ‘hiring’ them we will
provide them with food and drinks for energy. However crew will possibly be
tired as were filming all day.
|
|
Traffic
|
·
Brick Lane
·
God’s own
junkyard
|
Cast and crew
|
N/A
|
We will take train and bus to our
locations. The day before we will check the train’s service to make sure
there is a good service as for buses we can check bus times.
|
|
Crowds
|
·
Brick Lane
·
Studio
|
Cast and crew
|
N/A
|
Go at off-peak hours therefore there
will be less people.
We will book the studio in advance and
only have the crew and cast in the room.
|
Subscribe to:
Posts (Atom)
-
When we were together, I held you down I gave you all of me, but look at us now Thinking of all your excuses, but they don't add u...
-
During the process of filming we faced different difficulties to do with other people schelde and working around other people timetables. S...
